Project Profiles
Hannaford Brothers

See below to view more pictures.

CLIENT:
Hannaford Brothers Company
New York Distribution Center
Schodack Landing, NY

EXISTING ROOF:
160,000 SF
Ballasted EPDM
Freezer & Cooler Areas

PROBLEM:
Increased leaks were developing in the 16 and 18-year-old EPDM sections of Hannaford’s freezer and cooler warehouse roofs.  With the roof’s insulation thickness approaching eight inches, Hannaford chose to be proactive and reroof while they could still salvage their existing insulation. Total removals of all roofing and insulation would have proven extremely costly, with serious disruption, particularly over their freezer area.

SOLUTION:
Mechanically attached TPO
Heat-Welded Single-Ply Roof System.
 
APPLICATION:
After evaluating proposals from a number of firms, Hannaford selected S. D. Carruthers based in part on referrals from other associates, the quality and thoroughness of their research, and their proposed product and scope recommendations.

Of particular importance, was maintaining the vapor seals at all roof edge and penetration details to preclude condensation problems often associated with cold storage facilities. Prior to the project’s start-up, S. D. Carruthers engaged a technical project analyst from the roof system manufacturer to review and inspect these critical details. 

After removing 800 tons of stone ballast and more than 5,000 concrete pavers, installation of the new roof system proceeded smoothly and safely.  One inch of additional polyisocyanurate insulation was installed, providing an acceptable substrate for the new membrane, and an R-6 increased insulation value.  A 60 mil, white, reinforced TPO membrane was then mechanically attached to the underlying steel deck in compliance with the manufacturer’s specifications. All membrane seams were hot air welded, providing the industry’s strongest seams and maximum protection. Walkway areas previously comprised of concrete pavers were then replaced with new TPO walkway tread, heat-welded to the new membrane.

RESULTS & OWNERS COMMENTS:
Being an environmentally conscious company, Hannaford also sought to reduce energy consumption in conjunction with this important project. By selecting a white, reflective membrane, combined with added insulation, they anticipate a meaningful reduction in annual energy costs for this key climate controlled facility.

Months after completion, James Baisley, Hannaford’s Facility Manager, commented:

James Baisley“Carruthers was the first roofing contractor to work on our site that got the job done right the first time…. absolutely no leaks”.

 


New white, reflective TPO roofing on cooler and freezer warehouse areas

Please click on a photo below to view as larger image above.
BEFORE        
AFTER        
APPLICATION      
 

Go to other project profiles